Safety - Company Training
employees receive 10 hours of initial training with 8 hours of update
training every 12 months.
Documentation of personnel training is
maintained at
Chesterton location and is
available for project specific requirements.
Training is verified with
written tests, hands on training, and project site audits. In addition
to
written safety program, the following
items are part of the training programs at
.
New Hire Orientation Outline | ||
Asbestos Awareness |
Bloodborne Pathogens |
Confined Space Entry |
Driver Safety Training |
Drug Free Work Place |
Electrical Safety |
Emergency Procedures |
Excavation Training |
Fall Protection |
Fire Protection/Prevention |
First Aid |
Gas Hazard Awareness |
H2S and Benzene Awareness |
Hand and Power Tools Safety |
Hazard Communications |
Hot Work |
Housekeeping |
In Plant Rail Safety |
Incident Reporting |
Introduction to OSHA |
Lockout/Tagout |
OSHA PSM 1910.119 |
PPE Use and Care |
Powered Platform,Truck Safety |
Respiratory Protection |
Signs, Barricades, Flagging |
Scaffold Safety |
Stairways and Ladder Safety |
Site/Job Specific Hazards |
Sampling and Air Monitoring |
Waterblasting Safety |
Worker Legal Rights |
Vacuum Truck Safety |
Advanced Training | ||
40 Hour Hazwoper |
Advance Atmospheric Testing |
First Aid CPR/AED American Red Cross |
Forklift Operation |
Hazard Recognition |
Health Effects of Lead |
Lead Handling Procedures |
Line Breaking |
MSHA 30 CFR Part 46 Training |
P4 Handling Procedures |
Personal Decon |
PPE Use and Care |
Project Safety Hazard Analysis |
Respirator Protection Standards |
Site Health and Safety Plans |
Superfund Community Relations |
||
Materials Used for Training | ||
Handbooks |
Hands-on Props |
Interactive CD |
Powerpoint |
Verbal Instruction |
Video Tapes |
Programs and Procedures | ||
Accident Investigation Format |
Bloodborne Pathogens |
Fall Protection |
Hazard Communication |
Incident Management |
Lockout/Tagout |
Permit Required Confined Space Entry |
Process Safety Summary |
Respiratory Protection |
Sewage Exposure Control Plan |
||
Substance Abuse Program Testing includes: | ||
DOT |
In Service |
Post Accident |
Pre-employment |
Probable Cause |
Random |
Safety Meetings | ||
Weekly for Project Supervisor | ||
Project Safety Audits | ||
Conducted by Safety Manager on a random basis | ||
219.763.1111
Service Locations | Administrative Offices | |||


